




Client: Westminster School
Value: $25 million
Project Timeframe: 2024 – 2026
Services Provided: Project Management, Superintendent
Key Features:
- New 2-level building within existing campus
- Live school site
- Art and STEM spaces
- Flexible, technology-integrated learning spaces
- Adaptive classrooms
- Immersive outdoor learning environments
- Collaborative staff spaces.
Westminster School is a leading South Australian Independent School that provides education services from ELC through to year 12 with a Senior School of 900 students and a Prep School of 470 students.
RCP has been appointed to Stage 1 new two level purpose-built Junior Primary building within its Preparatory School
The new building supports Reception to Year 3, and which has been designed to support curious minds and adventurous learning.
RCP has been engaged as the project manager and superintendent for the Preparatory School redevelopment.
Construction is expected to commence at the end of 2025, with the building set to open for the start of the 2027 school year.
Images courtesy of Brown Falconer.