![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_1.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_2.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_3.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_4.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_5.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_6.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_7.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_8.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_9.jpg)
![](https://www.rcp.net.au/rcp19/wp-content/uploads/2021/07/Norwest_website_889x500_10.jpg)
Client: Mulpha Norwest Pty Ltd
Value: $140m
Project Timeframe: 2021-2024
Services Provided: Project Management, Project Programming
Features:
- Mixed use development
- 196 dwellings
- 3,300m2 retail
- 14 storeys (Building B) and 23 storeys (Building C) centred around a central plaza basement parking
RCP was engaged by Mulpha Norwest Pty Ltd, to provide project management and project programming services for the Norwest Quarter Stage 1 development in Sydney.
The proposed mixed-use development is due to commence construction early 2022 with completion planned for mid-late 2024. The development will contain 196 dwellings and 3,300m2 of retail across two buildings, which include 14 storeys (Building B) and 23 storeys (Building C) centred around a central plaza with shared basement parking.
Building B has been designed by Smart Design Studio and Building C has been designed by Bates Smart. The project also has a strong ESD ambition of targeting 100% renewable energy, zero waste, and the water sensitivity that the world needs.
Following Stage 1 early contract involvement (ECI), consultant procurement, design, contractor tender and award, construction commenced in August 2022.